Part IV

Move the Goods

Freight, customs clearance and claims

11. Choose the transport mode by constraint, not by habit

The right question is never "what is the cheapest shipping method". It is: given the shipment's chargeable weight/volume, the deadline, the product's restrictions and the landed-cost model, which mode clears the constraint at the lowest total cost? Freight is one line in §1, and the cheapest line on a rate sheet is often the most expensive once destination charges are included.

### The mode matrix

ModeEconomic rangeIndicative transit (port-to-port / door, excluding production)Relative costWhen it winsWhen it fails
International express courierSamples up to ~500 kg; small parcels~3–7 days door-to-doorHighest per kgSamples, urgent replenishment, first small batch, minimal clearance complexityBulky/light goods (dimensional weight), restricted goods, low-value items; minimum billing charge makes tiny parcels disproportionately expensive
Air freight (via forwarder)Above ~500 kg chargeable~5–10 days plus clearance and deliveryHighTime-critical, high-value, moderate volumeRequires your own broker and compliance documents; fixed per-shipment costs make small consignments uneconomic
LCL sea freightRoughly 2–20 CBM~30–45 days plus origin/destination handlingLowConsolidated first orders, mixed suppliers, non-urgent replenishmentFixed charges per shipment dominate below ~2 CBM; longer and less predictable than FCL
FCL sea freightAbove ~20 CBM, or when you need container control~30–45 days plus inland legsLowest per unitStable volume, one supplier or a consolidated container, damage-sensitive goodsCash tied up longer; requires enough volume to fill
China–Europe railUsually full container load~15–25 daysRoughly between sea and airLandlocked European destinations, mid-urgency replenishmentLimited network, route and geopolitical exposure, fewer LCL options — confirm current routings and sanctions compliance
Sea/air + local parcel deliveryFrom ~50–100 kg upwardFaster than standard LCL on mature lanesMediumMarketplace sellers replenishing local fulfilment centresOnly viable with a proper formal import entry; see the warning below
Postal / e-packetUnder ~2 kgVariable, often 10–30 daysLow per parcelIndividual dropship ordersDuty and handling fees now apply per item in major markets; no consolidated clearance, no control over the declaration

Transit times are indicative door-to-door ranges, not commitments. Add production lead time, origin handling, customs examination and inland delivery. Since 2024, diversions away from the Suez/Red Sea route have added roughly 10–14 days on many China–Europe sailings; build schedule buffer and confirm the routing your forwarder actually booked.

### Chargeable weight: the calculation that changes everything

Carriers bill on the greater of actual gross weight and dimensional (volumetric) weight.

Dimensional weight (kg) = length(cm) × width(cm) × height(cm) ÷ divisor
Express courier:  divisor 5000
Air freight:      divisor 6000
Sea freight:      usually billed on CBM (1 CBM = 1,000,000 cm³), with a
                  weight/measure (W/M) rule — carrier charges per CBM or
                  per 1,000 kg, whichever is greater

A 100 × 100 × 100 cm box weighing 10 kg is 1 CBM. Under the express divisor it is billed at 200 kg; under the air-freight divisor at 167 kg. That is a 16.7% reduction in dimensional weight from the divisor alone — not the "about 34%" sometimes quoted. Additional savings come from the air-freight rate structure itself, but the divisor change is one-sixth, and if the actual weight exceeds the dimensional weight the divisor is irrelevant.

Practical consequence: for bulky, low-value goods, redesign the packaging before shopping for a cheaper carrier. Reducing carton volume by 20% does more than a rate negotiation. Ask for packed carton dimensions and CBM for the full order in the RFQ — otherwise you cannot price freight at all.

### Restricted and dangerous goods

Lithium batteries (UN3480/3481), liquids, powders, magnets, aerosols, perfumes, and some chemicals require a dangerous-goods declaration, UN38.3 test summaries, SDS/MSDS, specific packaging and labelling, and carrier approval. Surcharges and refusal are common; some forwarders offer "special lines" that route these goods through channels with less rigorous documentation. That is a compliance risk that lands on the importer, not the forwarder. Declare accurately.

### The consolidated-shipment warning

Bundled "sea + last-mile" or "duty-paid line" services became popular because a forwarder consolidates many sellers' goods into one container, clears them, and hands parcels to a domestic carrier. Since de minimis ended, this structure is more attractive than individual parcels — provided the import is a proper formal entry with a legitimate importer of record, correct HS classification, correct valuation and duty paid, and with documentation you can produce in an audit.

Before using one, ask: who is the importer of record, which entry number covers my goods, will I receive the entry summary and duty payment evidence, and is VAT handled in a way that is valid for my tax position? If the answer is "don't worry, it's all included", walk away. A cheap rate that leaves you with no clean import record is a liability, not a saving.

### How to read a freight quote

A quote that shows only a per-kg or per-CBM rate is incomplete. Obtain an all-in, itemised quote covering:

  • Origin: pickup, inland trucking, export declaration, origin terminal handling, documentation fee.
  • Main carriage: ocean/air/rail freight, fuel and peak-season surcharges.
  • Destination: terminal handling, devanning/LCL fees, port storage, customs entry and broker fee, ISF/ENS/ACI-type advance filings, examination fees if incurred, demurrage and detention terms, chassis/drayage, delivery appointment, residential or fulfilment-centre surcharges.
  • Taxes and duties (or a clear statement that they are excluded and payable by you).
  • Insurance, and exactly which clause applies.
  • Cut-off dates, free-time allowances, and the rate's validity.

Ask who controls the booking. When the supplier's forwarder handles everything, the freight cost is buried in the product price and you lose visibility; when your own forwarder controls it, you gain transparency and responsibility for coordination. For a first order, either is workable — but decide deliberately, and make sure the Incoterm matches.

12. Clearance: your job, even if someone else files

You can outsource the filing. You cannot outsource the liability. The importer of record is answerable for classification, valuation, origin, admissibility, marking, duty and recordkeeping — and for any penalties.

### Registrations to have before the first shipment

MarketTypical prerequisites
USIOR number (EIN or CBP-assigned), customs bond for formal entries, broker power of attorney, ISF filing for ocean cargo, product-specific registrations (e.g. FDA establishment registration where applicable)
EUEORI number, VAT registration / IOSS for distance sales, an EU-established responsible economic operator under GPSR, authorised CBAM declarant status where the 50-tonne threshold is met
Great BritainEORI (GB), VAT registration, UK-established importer details on product, UK Responsible Person for specific sectors; separate NI arrangements
CanadaCBSA import account, GST/HST registration, broker, bilingual labelling
AustraliaABN, broker for formal entries, GST, applicable mandatory standards and RCM

### The clearance document pack

DocumentNotes
Commercial invoiceConsistent with the PI and the payment record; correct Incoterm and currency; accurate value
Packing listCarton counts, net/gross weights, dimensions, marks
Bill of lading / airway billShipper, consignee, notify party; telex release or original B/L as agreed
Certificate of originNon-preferential, or a preferential form under an applicable FTA
Advance cargo filingsISF (US ocean), ENS (EU), ACI (Canada) and equivalents — filed before loading, with penalties for late or inaccurate data
Classification worksheetYour HTS/CN code and written rationale
Compliance documentsDoC, test reports, certificates, technical file, risk assessment, labels and instructions, responsible-person details
Product identifiers / permitsIncreasingly required on low-value declarations; plus sector licences for food, plants, animal products, medical devices, telecoms, chemicals
Supply-chain traceabilityFor UFLPA-exposed categories: mapping to raw-material level, purchase orders, invoices, payment and transport records, production and capacity records, audit reports

### What actually causes delays

  • Inconsistent descriptions, quantities or values across the CI, packing list and B/L.
  • A missing or late advance filing.
  • Classification that does not match the product's characteristics.
  • Missing market-specific markings, language or responsible-person details.
  • Under-declared value or a "gift"/"sample" description for commercial goods.
  • Random or targeted examination, or a forced-labour, IP or safety hold.
  • Demurrage and detention from uncollected containers — often caused by an appointment not booked in advance.

Budget for examination fees and a few days of slack in every plan. Track the entry number and keep the complete file: US importers generally retain records for five years; EU GPSR technical documentation must be kept for ten years.

### After the entry

Duty is rarely final on the day of payment. Depending on the jurisdiction you may be able to file a post-entry correction / prior disclosure when you discover an error, protest a classification or valuation, claim a refund where duties were wrongly assessed or subsequently invalidated, or claim drawback on re-exported goods. These have deadlines, so review your first few entries with the broker rather than assuming they were right.

13. Insurance, loss and claims

Two persistent myths cost importers money.

Myth 1: "CIF insurance only helps if the whole shipment is lost." Wrong. CIF requires the seller to take out cargo insurance for the buyer's benefit, but the default is Institute Cargo Clauses (C) — a narrow, named-perils cover centred on major casualties. It is not "total loss only", yet it commonly excludes theft, water damage and rough handling. Under CIP the 2020 rules require the broader Clauses (A) cover. Either way, buy your own all-risks, warehouse-to-warehouse policy sized to the full landed value and check the exclusions (inherent vice, insufficient packing, delay, war and strikes, temperature-sensitive goods).

Myth 2: "The supplier's forwarder is responsible, so I'm covered." A forwarder's liability is normally limited by convention and contract to a small amount per kilo — nowhere near the value of a container of finished goods. Cargo insurance is cheap relative to the exposure; arrange it before the goods leave the factory.

Points to settle in writing:

  • Insurable interest shifts with the Incoterm. Under FCA/FOB the buyer bears voyage risk; under CIF/CIP the seller arranges minimum cover but risk still passes at origin. Know who is insuring each leg and whether there is a gap between the factory and the port.
  • Insured value should reflect commercial risk, commonly invoice value plus freight, duty and a margin — agreed with the insurer.
  • Claims pack: commercial invoice, packing list, B/L or AWB, insurance certificate, survey report, photographs taken at unloading, delivery receipt with exceptions noted, and a written claim within the policy's time limit. Note damage on the delivery receipt at the time — a clean receipt makes a later claim much harder.
  • Prevention: carton drop tests, palletisation, corner boards, moisture protection, container stuffing supervision, and a seal number recorded in the documents. Most "shipping damage" is packaging damage.

Questions about applying this to your own order? Send us your requirements and we will respond.

Ready to Source Products from China?

Tell us what you need. Whether you are looking for new suppliers or need help managing your existing suppliers, we are ready to discuss your sourcing requirements.

Start Your Sourcing Request
Get a Quote